![]() |
|
![]() |
|
|
Why should we choose ABE to be the integrator?
With ABE's vast experience across the spectrum of system disciplines, each job regardless of size always merits our specialist attention. Commitment and dedication are often used terms, but without these ideals ABE couldn't produce the perfect result every time. We have engineers who have free time so why don't we use them to install the system? Unless internal engineering staff are available full time throughout the project with full CAD facilities and a fast purchasing and cost control resource, then continuity is lost. This results in lack of documentation and control of the project's progress and budget. The ABE installation crews are committed to the specific jobs from start to finish. Is it necessary to have consoles and equipment racks, why can’t I just put the equipment onto my existing office furniture? It is important to install all equipment into the correct housing. Rack cabinets are manufactured to give equipment the right support environment maintaining operational temperatures and cabling entrances to the input and output ports. Is project management really necessary, when we have these resources and we know what we want? It is important to have a specialist manager in charge of a project, who has had previous specific experience. This focuses the operational parameters of the ongoing job through one manager which provides the client with accountability and a single point of reference. Why is it important to sign off drawings before the start of the build? ABE believes it is important that the maximum effort is put into all aspects of the project. By both client and ABE agreeing and signing build drawings, exact requirements are finalised and understood. What is the necessity of having a cabling infrastructure? When any system is designed and built it is imperative to set up a robust cabling infrastructure. ABE's experienced designers maintain that good cabling management makes system upgrades logical and simple What are cable schedules and why do I need them if we have numbers on the drawings? ABE's cable schedule is one of the most important documents next to the drawing portfolio. It provides essential building information to ensure the installation is properly constructed in a logical sequence. It also provides information such as cable numbers, connector type, signal source/destination and equipment location. Why do I need to get an integration company in, when I can design the system myself and hire wiremen to connect the equipment up for me? The design and drawing portfolio for a system is a fundamental requirement for a stable and robust facility. ABE Systems’ integration is professionally structured to an extremely high level ensuring longevity and reliability with possible future upgrades in mind. Because a firm price is given, costs are always controlled and known in advance. |